Direct Interface for
CNC, PLC & SCADA Systems
Industrial automation and process-control equipment demand keypads that are rugged, sealed and built to last in tough environments. DAVOLIN’s custom industrial keypads deliver excellent tactile response while keeping electronics sealed from water, dirt and physical abuse.
ENGINEERING APPROACH
Solutions
Adapt physical input to the machine HMI, panel opening and software workflow. The CNC tube-bender project demonstrates how an existing keyboard platform can be integrated into an OEM console.

01
Combine keyboard, cursor and numeric entry
Review a full keyboard, trackball and numeric keypad as one input area for dimensions, bending parameters, programs and machine settings.
02
Adapt mounting to the finished console
Match panel dimensions, fixing details and cable outlet to the machine. The documented D-8605 project changed rear-panel mounting to front-panel installation.
03
Validate before production
Confirm the USB connection and mechanical fit through sample approval before series production. Review any additional machine-control integration as a separate design stage.
PROJECT EVIDENCE
Specific Case Studies
FIELD NOTES / 01


Industrial Machinery & Automation · Documented machine integration
Front-Mounted D-8605 for a CNC Tube Bending Machine
Challenge. The tube-bender console needed full keyboard input, trackball control and numerical entry, but required front installation rather than the standard rear mounting.
Solution. DAVOLIN redesigned the D-8605 mounting structure and matched its fixing details, panel dimensions and cable outlet to the CNC console, with a USB interface.
Result. After sample approval, the project progressed to a 100-unit production order. The customized keyboards were installed beside the touchscreen and machine controls.
Evidence boundary. The later concept of combining more machine controls into one operator panel remains a design direction, not a completed production configuration.
Building or Retrofitting a Control Panel?
Send your panel cut-out, interface, key legend and operating environment. Our automation team will reply within 24 hours with a DFM note and quotation.
Talk to an Automation Engineer


